|
|
|
|
|
|
|
|
|
|
  
|
|
|
|
|
|
|
|
|
|
|
News Headline : > Oil tanker on fire after hitting mine in Hormuz: Iran`s Guards   > China growth narrowly beats forecasts   > Coal extraction resumes at Barapukuria mine’s new phase   > Ziaur Rahman Foundation a remarkable example of humanitarian service: Zubaida   > Oil-rich Alberta votes on Canada breakup   > Maha Ashtami, Kumari Puja celebrated today   > Banks, stock markets to remain closed for 5 days from Tuesday   > Trump endorses Netanyahu for re-election as Israeli PM   > Some 1,500 shops and retailers damaged in French protests: trade group   > Health Minister for collective efforts to create breast cancer awareness  

   Business
Coal extraction resumes at Barapukuria mine’s new phase
  19, October, 2026, 11:22:14:AM

(BSS) – Coal extraction has resumed at the new phase of Barapukuria Coal Mine in Parbatipur upazila of the district after a suspension of two months and four days.

General Manager of Barapukuria Coal Mining Company Limited Khan Md. Zafar Sadik confirmed the development to BSS on Sunday, saying full-scale coal extraction from the new phase began on Sunday evening after the completion of necessary technical preparations.

He said the mine had remained closed for underground coal extraction and production since August 12, when coal reserves at the previous phase were exhausted. A total of 415,000 tonnes of coal had been extracted from that phase.

“Trial extraction from the new No-1405 phase began early on October 16. Following the completion of technical preparations, full-scale extraction resumed on Sunday evening, restoring operational activity at the mine after the prolonged suspension”, he added.

During the shutdown, engineers and mine workers successfully transferred heavy machinery and modern equipment from the No-1309 phase to the new phase. They also developed underground safety structures and completed various technical renovation works.

Khan Md. Zafar Sadik said the new phase was considered highly sensitive and technically complex due to underground geological conditions and other technical challenges. Although trial extraction began on October 16, it took additional time to prepare the phase for full-scale production.

According to preliminary estimates by engineers, the new phase is expected to yield around 300,000 to 380,000 tonnes of coal.

Regarding the overall coal stock, the general manager said more than 600,000 tonnes of coal were currently stored at the mine`s main coal yard, against its normal storage capacity of around 320,000 tonnes.

Despite the surplus stock, coal extraction from the new phase has been kept operational to ensure supplies to the thermal power plant when it resumes operations, he said.



  
  সর্বশেষ
Seven Decades of Global Trade: The Secret Behind Canton Fair`s Enduring Appeal and Success: CMG Editorial
Botswana’s President Grants Exclusive CGTN Interview: A Strong Signal to Cement Ties with Beijing
Documentary `Shenzhou 13` Screened in Yunnan to Mark Four-Nation Mekong River Joint Patrol
Yangtze River Delta International Youth Film Week Opens with Grand Ceremony in Ningbo
Digital Truck Scale | Platform Scale | Weighing Bridge Scale
Digital Load Cell
Digital Indicator
Digital Score Board
Junction Box | Chequer Plate | Girder
Digital Scale | Digital Floor Scale
Dynamic Solution IT
POS | Super Shop | Dealer Ship | Show Room Software | Trading Software | Inventory Management Software
Accounts,HR & Payroll Software
Hospital | Clinic Management Software

Editor : M.G. Kibria Chowdhury Published By the Editor From 85/1 Nayapalton 5th Floor, Dhaka -1000 & Printing Him From Sharayatpur Printing & Press 234 Fakirafool, Motijheel Dhaka-1000.
Phone : 9346453 Mobile : 01712-714493 E-mail: worldreport21@gmail.com